Projectname Category
Construction of a Standard Gauge Railway Line in Tanzania
To optimize the connection of the central African back country to the million-strong metropolis and port city Dar es Salaam, Tanzania is building a modern railway line. The line runs on 1,200 kilometers, in ...
Railway
Rehabilitation and upgrading of the railway line along the Yalama-Sumgait Corridor in Azerbaijan
The railway line from Sumgait, near Baku, the capital of Azerbaijan, to Yalama on the Russian border has a total length of 172 km and runs along the coast of the Caspian Sea. The section comprises 18 stations ...
Railway
Design Review Padma Bridge Rail Link Project
The Padma Bridge Rail Link is located in the Middle Western part of Bangladesh. The total length of bridges is 31 km. There are 3 high viaducts with a total length of 21.86 km, 66 major bridges with a total ...
Railway
High-speed railway line from Beijing to Shenyang - Hebei Section Lot 2
The project is located 250 km north of Beijing in direction to Shenyang near the city of Chengde. The length of the section is 54.40 km, including 15 Tunnels (total length 22.55 km), 1 Adit Tunnel (total ...
Railway
High-speed railway line from Shangqiu to Hefei to Hangzhou - Anhui Section Lot 7
The planned section includes: Huanghuashan Grand Bridge, Earthworks, Xiatang Grand Bridge, Earthworks (Left)
Railway
High-speed railway line from Zhengzhou to Wanzhou – Chongqing Section Lot 3
Consulting, examination and training of on-site supervision for engineering structures, earthworks, tunnel construction. Within the construction lot the line passes mountainous terrain and is designed mostly as ...
Railway
High-speed railway line from Zhengzhou to Wanzhou – Henan Section Lot 2
The line length is 40.82 km in lot 2, start from DK49+149.73 to DK89+970. The main works include subgrade engineering work with length 2.31 km, earth engineering work with 600,000 m3, CFG pile engineering works ...
Railway
High-speed railway line from Beijing to Wuhan Passenger Dedicated Line
The applied system of ballast-less track is the Chinese Railway Track System 2, a development of the system Max Bögl used for the PDL Beijing – Tianjin.
Railway
High-speed railway line from Nanning to Guangzhou - Yujiang Bridge, Nanning
The continuous steel truss girder is supported by stay cables in fan-like arrangement. Pylons are of reinforced concrete as hollow sections.
Railway
High-speed railway line from Beijing to Shanghai, Nanjing Big Bridge - Geological Supervision
The Nanjing Dashengguan Yangtze bridge is one of the main structures on the high-speed railway line from Beijing to Shanghai.
Railway
Projects: 22