Projectname | Category | |
---|---|---|
Supervision for work preparations, steel constructions at the plant and their execution
|
Railway | |
Supervision for work preparations, steel constructions at the plant and their execution;
|
Railway | |
Optimization of prefabricated single-span girder system (32 m).
|
Railway | |
Consulting, examination and training of on-site supervision for engineering structures, earthworks, tunnel construction and superstructures, track construction, overhead-cable and signalling technology as well ...
|
Railway | |
Supervision bei der Ausführung. Beratung, Überprüfung und Schulung der site supervision für Ingenieurbauwerke, Erdbau und Oberbau.
|
Railway | |
Design consulting for optimization of the prefabricated single-span girders with 32 and 24 m span width.
|
Railway | |
Consulting, examination and training of on-site supervision for engineering structures, earthworks and superstructure as well as production of prefabricated single-span girders with 32 and 24 m span widths.
|
Railway | |
Establishing of calculation manual in Chinese language.
|
Railway | |
Verification of serviceability of the viaducts’ superstructure for use of ballast-less track type Züblin.
|
Railway | |
Design consulting for ballast-less track in Chinese construction method.
|
Railway |
Projects: 22