Projectname | Category | |
---|---|---|
![]() |
The planned section between Hangzhou and East Yangxungiao runs completely over bridges, among them the superbridge over the Quianjiang River, length 1810 m. Included is the Hangzhou South Station.
|
Railway |
![]() |
The planned section runs over 12.664 km on subgrade, 30.718 km on bridges (64 bridges) and on 58.363 km in tunnels (36 tunnels). Included are two railway stations.
|
Railway |
Projects: 22